Each production lot is subject to first-piece verification, in-process checks and final inspection. Inspection frequency, acceptance criteria and reporting requirements are established for the project.
Incoming materials are reviewed against the specified grade, condition and required documentation. Additional material verification, including PMI where appropriate, is determined by the material and project requirements.
Formal First Article Inspection (FAI), SPC monitoring, Cp/Cpk studies and PPAP documentation can be included where required and agreed, with their scope and submission requirements defined during production planning.