Transferencia de fijación de inspección: Preservar la configuración del datum en pedidos repetidos

» Blog » Inspection Fixture Transfer: Preservar la configuración del datum en pedidos repetidos

Transferencia de fijación de inspección: Preservar la configuración del datum en pedidos repetidos

November 15, 2026

Moving inspection to a replacement fixture or another site can change how a component seats even if the drawing and measurement program are unchanged. The transfer package should explain how the fixture relates to the drawing and how buyer and supplier will compare the first measurements.

Record functional locators and clamps separately

Show the points or surfaces used to establish the setup and identify the clamps that hold the component against them. Record the sequence where it affects seating. A photograph is useful evidence of orientation, but it does not replace a controlled locator plan when a change could affect results.

Document what the program assumes

Identify fixture revision, drawing revision, probing access and the approved alignment method. Note characteristics that use a different setup. If a support or locator is adjusted, capture its new position and how it was verified before using the fixture for acceptance.

Compare results before releasing production

Agree a small correlation exercise using identified parts and the characteristics most sensitive to seating. A disagreement should trigger investigation of the setup, method and component state rather than an automatic change to the drawing. Keep records with the first accepted lot for future transfers.

What to include in the RFQ

  • Fixture identifier, revisión, locator map, and clamp sequence
  • Drawing callouts handled by each setup
  • Comparator parts and agreement criteria for transfer

For parts with a mounting-hole pattern, link the measured pattern back to the drawing so that a repeat-order report retains the original drawing references.

Review our inspection planning and reporting process before confirming the scope for a repeat order.

Technical reference: ASME overview of datum references and geometric tolerancing.